It’s not all bad!

That last post was a bit serious, so here’s some snaps of recent progress…

The stud wall to the pantry replaced the Aga and hearth
20140806 Pantry Frame

The underfloor heating manifold was repositioned
20140806 Repositioned Manifold

New power, cat6 and speaker cables were installed downstairs
20140806 Master Cabling

Underfloor heating was installed and pressure tested
20140806 UFH Pressure Testing

It was a lovely day in the boot room
20140806 Boot room

And here’s the build team that’s making it happen; Jamie, John, Matt and Shaun
20140806 Brickhurst